Trail Run Project Logo

Bike Trail

Easy
 3.0 (1)

This is an easy, flat, paved-surface trail.


Your Rating:      Clear Rating
Your Difficulty:
Your Favorites: Add to Favorites · Your List
Zoom in to see details
Map Key

1.9

Miles

3.1

KM

97%

Runnable

777' 237 m

High

553' 168 m

Low

52' 16 m

Up

250' 76 m

Down

3%

Avg Grade (2°)

15%

Max Grade (9°)

Dogs Unknown

Features -none-

Description

The paved Bicycle Trail begins near the campground and routes to the center of the park. Yellow blazes denote the trail. Along the way, it passes a small cemetery on the right near an access road. The trail leads through a tunnel built in the 1930s by the CCC. Follow on and find Crystal Spring, one of two continuous springs in the park. The trail passes the trailhead and the parking area (look for a small footbridge). The trail continues north and intersects and shares a section with the Woodbine Trail.

Contacts

Shared By:

Missouri Hiker

Trail Ratings

  3.0 from 1 vote

#29236

Overall
  3.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
100%
2 Star
0%
1 Star
0%
Trail Rankings

#498

in Missouri

#29,236

Overall
2 Views Last Month
50 Since Apr 25, 2019
Easy

100%
0%
0%
0%
0%
0%

0 Comments

Weather


Current Trail Conditions

Update Conditions
Unknown See History
Add Your Check-In

Check-Ins

none