Trail Run Project Logo

green Stoddard Pathway

Trail

2.9 mile 4.7 kilometer point to point
100% Runnable
Easy

Elevation

Ascent: 7' 2 m
Descent: -50' -15 m
High: 2,545' 776 m
Low: 2,502' 763 m

Grade

Avg Grade: 0% (0°)
Max Grade: 1% (1°)

Dogs

Leashed
Driving directions Take a virtual tour
Zoom in to see details
Map Key

Trail shared by Joseph States

Weather

Getting forecast...

Current trail conditions

Update Conditions
Unknown See History

Navigate on-trail with our free app

iOS App Store Android App Store

A quiet, secluded Rail-to-Trail in South Nampa.

Joseph States

Features -none-

This trail is maintained by the Nampa Parks and Rec. It is closed from sunset to sunrise.

Description

Stoddard Pathway is a rail-to-trail project that is still underfunded and in the works. The trail and the right of way are established but the north end of the trail is as of 2018, still unpaved.

From the south end: The trail starts at the Ridenbaugh Canal and runs north with connections to various subdivisions, Maple Wood Park, and the Partridge Pathway Trail.

This trail crosses the following roads: Locust Ln, Greenhurst Rd, Iowa Ave, Amity Ave, and Sherman Ave where it ends as of 2018.

Run this trail?

We need help with the following missing trail information:

Photos, Need to Know, Features, Flora & Fauna, Runner Notes

Contacts

Rate This Trail

Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Check In

Check-Ins

none

Trail Ratings

  3.0 from 1 vote

#20591

Overall
  3.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
100%
2 Star
0%
1 Star
0%
Trail Rankings

#525

in Idaho

#20,591

Overall
21 Views Last Month
177 Since Feb 27, 2018
Easy Easy

100%
0%
0%
0%
0%
0%

0 Comments

Trail Run Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Running