Trail Run Project Logo

Red Trail

Intermediate
 4.2 (6)

The western segment of a smooth and rolling trail built in a modern and sustainable style.


Your Rating:      Clear Rating
Your Difficulty:
Your Favorites: Add to Favorites · Your List
Zoom in to see details
Map Key

3.7

Miles

6.0

KM

99%

Runnable

978' 298 m

High

844' 257 m

Low

240' 73 m

Up

239' 73 m

Down

2%

Avg Grade (1°)

10%

Max Grade (6°)

Dogs Unknown

Features -none-

This trail is open to both bikes and foot traffic. Please stay alert on the trails and respect other users.
Open 30 minutes before sunrise to 30 minutes after sunset. Closed when wet and seasonally after the last thaw until the trail surface dries and hardens.

Description

Start at either the upper or lower trailhead, really wherever you find a parking spot, although the lower parking area lets you end on a faster downhill section. The trail is one way in a counter-clocckwise direction.

Enjoy a smooth trail on 100% singletrack only minutes from Cleveland. The trail has a hard packed clay surface. It goes past some nice views of river beds and small water carved gulleys. Shortly before it intersects with the Yellow Trail, there is a out and back spur.

Contacts

Land Manager: Cleveland MetroParks

Shared By:

ESG Greene

Trail Ratings

  4.2 from 6 votes

#8555

Overall
  4.2 from 6 votes
5 Star
33%
4 Star
50%
3 Star
17%
2 Star
0%
1 Star
0%
Trail Rankings

#166

in Ohio

#8,555

Overall
6 Views Last Month
305 Since Sep 29, 2017
Intermediate

25%
0%
75%
0%
0%
0%

Photos

Red Trail. MetroParks Strongsville.
Aug 30, 2020 near Strongs…, OH
Looks fun right?
Sep 29, 2017 near Strongs…, OH

0 Comments

Weather


Current Trail Conditions

Update Conditions
All Clear 53 days ago See History
Add Your Check-In

Check-Ins

Nov 30, 2019
EMILIA SANTOS
3.7mi