Adventure Projects is hiring a web engineer to join us in Boulder, CO
Trail Run Project Logo

Grand Trunk Trail - Westville Section

 3.0 (1)

2.9 Miles 4.7 Kilometers


98%

Runnable

166' 51 m

Ascent

-98' -30 m

Descent

2%

Avg Grade (1°)

12%

Max Grade (7°)

606' 185 m

High

521' 159 m

Low

Shared By Dan Broman

Conditions


Unknown

Getting forecast...

This trail traverses along an old railroad grade following the Quinebaug River.

Dan Broman

Dogs Leashed

Features Fall Colors · Lake · River/Creek · Swimming · Wildlife

Description

This smooth doubletrack trail starts downstream of Westville Dam and follows along the Quinebaug River. At 0.8 miles, the trail reaches the dam. A bridge on the left (over the river) provides access to the Heritage Trail. At around 1.7 miles, the trail reaches Westville Recreation Area and passes two picnic shelters and the parking area. Crossing the road, the trail continues along the river and reaches the Ed Calcutt Memorial Bridge at 3.5 miles. The trail currently ends 3.7 miles in at River Road, with proposed extensions continuing upstream to connect with the greater Sturbridge trail network.

Contacts

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

none

Trail Ratings

  3.0 from 1 vote

#16576

Overall
  3.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
100%
2 Star
0%
1 Star
0%
Rankings

#140

in Massachusetts

#16,576

Overall
7 Views Last Month
203 Since Dec 24, 2016
Easy Easy

100%
0%
0%
0%
0%
0%

0 Comments

Trail Run Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Running