Trail Run Project Logo

IMBA Trail

 3.0 (1)
Trail Mapped Wrong?

Length

0.1 Miles 0.2 Kilometers

98%

Runnable

Elevation

22' 7 m

Ascent

-2' -1 m

Descent

3%

Avg Grade (2°)

5%

Max Grade (3°)

125' 38 m

High

103' 31 m

Low

Conditions


Unknown

Getting forecast...

A singletrack trail created to bypass the Sewer Line/ Fall Line Trail.

Dot Helm

Overview

Like with all trails, please stay off when wet, esp. during breakup.
Features: -none- [Add/Remove]
Dogs: Leashed

Description [Suggest Changes]

This is a nice singletrack built during an IMBA training session in 2004 to create a sustainable trail bypassing a steeper trail. This trail was built before the utility corridor (which displaced the original trail), but the turn point was rebuilt after the utility corridor was constructed.

Flora & Fauna [Suggest Changes]

Poplar and other usual plants.

Contacts

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

none

Stewarded By


Trail Ratings

  3.0 from 1 vote

#20011

Overall
  3.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
100%
2 Star
0%
1 Star
0%
Rankings

#145

in Alaska

#20,011

Overall
3 Views Last Month
20 Since Sep 8, 2016
Easy Easy

100%
0%
0%
0%
0%
0%

0 Comments

Trail Run Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Running