Quarry Trail

 2 votes
Building Map
Loading Map Data
Map Settings
Featured Run
Trail

1.0 Miles 1.7 Kilometers

 

98% 

Runnable

Singletrack

78' 24 m

Ascent

-76' -23 m

Descent

1,223' 373 m

High

1,165' 355 m

Low

3%

Avg Grade (2°)

8%

Max Grade (5°)

Unknown

Update

This is a connector trail between the Upper Hixon trails and the old MVC Quarry atop the bluffs.

Michael Borst

Description

This trail features a singletrack route out to the old Mathey Quarry atop the bluffs. The trail is generally flat, and though singletrack, there won't be many obstacles to overcome. Along the way, you'll make your way along the side slope of a ridge, so be careful as the terrain to the side of the trail can be steep.

It runs along a horse farm as well, so stop to admire the horses as you pass.

Contacts

Rate Trail


   Clear

4.0 from 2 votes


Get On-Trail Navigation

Send to Phone
Your Check-Ins

Check-Ins

none

Trail Ratings

  4.0 from 2 votes

#1696

Overall
  4.0 from 2 votes
1 Star
0%
2 Star
0%
3 Star
50%
4 Star
0%
5 Star
50%
Rankings

#29

in Wisconsin

#1,696

Overall
6 Views Last Month
82 Since Mar 9, 2016
Easy/Intermediate Easy/Intermediate

0%
100%
0%
0%
0%
0%

Conditions



Forecasting the weather...

0 Comments

Trail Run Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Running