Trail Run Project Logo

O&W Rail Trail Connection: Kingston Greenline

Intermediate
 3.0 (1)

Starts in Uptown Kingston and continues to the Town of Hurley on the 25.9 mile long O&W Rail Trail.


Your Rating:      Clear Rating
Your Difficulty:
Your Favorites: Add to Favorites · Your List
Zoom in to see details
Map Key

2.0

Miles

3.2

KM

100%

Runnable

163' 50 m

High

154' 47 m

Low

19' 6 m

Up

23' 7 m

Down

0%

Avg Grade (0°)

2%

Max Grade (1°)

Dogs Unknown

Open to the Public but trail is undeveloped.

Description

Part of the expanding Kingston Greenline, this section starts in Uptown Kingston at the parking lot of the Super 8 Motel on Washington Ave and continues to the Town of Hurley connecting with the 25.9 mile long O&W Rail Trail - Accord to Hurley.

As of 2019, Ulster County has completed its Final Design Report for the NYSDOT and is in the process of acquiring right-of-way for the project. Construction is anticipated to begin in 2020 if permanent easements can be acquired in a timely manner. The undeveloped trail is currently open to the public.

Shared By:

Walt T

Trail Ratings

  3.0 from 1 vote

#3

in Kingston

#31086

Overall
  3.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
100%
2 Star
0%
1 Star
0%
Trail Rankings

#3

in Kingston

#880

in New York

#31,086

Overall
2 Views Last Month
9 Since Apr 4, 2021
Intermediate

0%
0%
100%
0%
0%
0%

0 Comments

Weather


Current Trail Conditions

Update Conditions
Unknown See History
Add Your Check-In

Check-Ins

none