Trail Run Project Logo

Zushi to Kamakura

Intermediate/Difficult

Trail

2.3 mile 3.7 kilometer point to point
86% Runnable
Intermediate/Difficult

Elevation

Ascent: 441' 134 m
Descent: -352' -107 m
High: 458' 140 m
Low: 93' 28 m

Grade

Avg Grade: 7% (4°)
Max Grade: 36% (20°)

Dogs

Unknown
Driving directions Take a virtual tour
Zoom in to see details
Map Key

Trail shared by Jesse Eriksen

Weather

Current trail conditions

Update Conditions
Unknown See History

Navigate on-trail with our free app

iOS App Store Android App Store

A nice run from Zushi to Kamakura.

Jesse Eriksen

Features Views

Need to Know

This trail starts at Hisagioike Park in Zushi. There is a small parking lot. There are no restrooms or water facilities at the park. If you venture out from either end of the trail, vending machines won't be too far away.

Description

This trail covers some of the area between Zushi and Kamakura.

The first hill going up is pretty steep. Once you reach the top of the first hill, the trail is great. There are several other trails that branch off of this one. The final downhill is also steep. The trail ends at Asaina Kiridoshi, which is one of the historical passes into Kamakura, built in 1241.

On the Kamakura side, there are near by access trails to the trails going around Kamakura.

Run this trail?

We need help with the following missing trail information:

Dogs Allowed, Flora & Fauna, Runner Notes

Rate This Trail

Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Check In

Check-Ins

none

Trail Ratings

  4.0 from 1 vote

#5

in Kanto Region

#16061

Overall
  4.0 from 1 vote
5 Star
0%
4 Star
100%
3 Star
0%
2 Star
0%
1 Star
0%
Trail Rankings

#5

in Kanto Region

#6

in Japan

#16,061

Overall
3 Views Last Month
7 Since Aug 28, 2019
Intermediate/Difficult

0%
0%
0%
100%
0%
0%

Photos

Historical sign about Asaina Kiridoshi.
Aug 28, 2019 near Zushi, JP

0 Comments

Trail Run Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Running