Trail Run Project Logo

This is a short connector trail from the Volksmarch Trail to the Main Hiking Trail.


Your Rating: Rating Rating Rating Rating Rating      Clear Rating
Your Difficulty:
Your Favorites: Add To-Do · Your List
Zoom in to see details
Map Key

1.8

Miles

2.9

KM

100%

Runnable

71' 22 m

High

32' 10 m

Low

27' 8 m

Up

65' 20 m

Down

1%

Avg Grade (1°)

4%

Max Grade (2°)

Dogs Leashed

Description

The East-West Connector Trail crosses two small foot bridges, but even still, your feet may get wet at times. There are lots of roots in places, so you'll want to watch your footing. The trail connects from the Volksmarch Trail to the Main Hiking Trail.

Contacts

Shared By:

Kirsten Hite

Trail Ratings

  5.0 from 1 vote

#3579

Overall
  5.0 from 1 vote
5 Star
100%
4 Star
0%
3 Star
0%
2 Star
0%
1 Star
0%
Trail Rankings

#27

in Florida

#3,579

Overall
4 Views Last Month
259 Since Dec 7, 2017
Intermediate Intermediate

0%
0%
100%
0%
0%
0%

Photos

Beautiful Trail.  I didn't cross paths with one human for hours.
Feb 16, 2022 near Wekiwa…, FL
Multicolor Sphagnum moss
Feb 16, 2022 near Wekiwa…, FL

0 Comments

Weather


Current Trail Conditions

Unknown
Add Your Check-In

Check-Ins

none
Welcome

Join the Community! It's FREE

Already have an account? Login to close this notice.