Trail Run Project Logo

Row River Trail

 3.7 (3)

16.7 Miles 26.9 Kilometers


100%

Runnable

466' 142 m

Ascent

-147' -45 m

Descent

1%

Avg Grade (0°)

5%

Max Grade (3°)

964' 294 m

High

644' 196 m

Low

Shared By Brock Warner

Conditions


Unknown

Getting forecast...

A scenic, paved rail-to-trail from Cottage Grove to Culp Creek.

Brock Warner

Dogs Unknown

Features -none-

Description

This paved rail-to-trail path runs almost 17 miles from the city of Cottage Grove to the hamlet of Culp Creek.

Following the gentle railroad grade, the trail begins in the midst of Cottage Grove. After meandering to the Mosby Creek Trailhead in the small town of Walden, the trail begins a very gradual climb up to the mountains surrounding Dorena Lake, a reservoir operated by the Army Corps of Engineers. After slicing through the forested shores of Dorena Lake, the trail returns to the countryside, passing through a few small logging communities, before finally terminating in Culp Creek.

Several parking areas and drop toilet facilities are along the trail, along with picnic tables and benches for enjoying the views. Although paved, this can make for a fun summer run away from the stress of traffic, or even a reprieve from the rainy grey of winter. The intrepid runner can combine this with the corresponding roads to create loops and other routes.

Contacts

You & This Trail


Rate Quality


   Clear Rating

Rate Difficulty

Share This Trail

Your Check-Ins

Check-Ins

Mar 11, 2017
Matt Rasmussen
Cottage Grove Half Marathon 13.1mi

Trail Ratings

  3.7 from 3 votes

#13472

Overall
  3.7 from 3 votes
5 Star
33%
4 Star
0%
3 Star
67%
2 Star
0%
1 Star
0%
Rankings

#419

in Oregon

#13,472

Overall
6 Views Last Month
105 Since Feb 14, 2017
Easy Easy

100%
0%
0%
0%
0%
0%

0 Comments

Trail Run Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Running