Trail Run Project Logo

Bailey Bridge Interim Trail

 1 vote

Length

2.5 Miles 4.0 Kilometers

100%

Runnable

Elevation

46' 14 m

Ascent

-21' -7 m

Descent

1%

Avg Grade (0°)

1%

Max Grade (1°)

658' 201 m

High

623' 190 m

Low

Conditions


Unknown

Getting forecast...

A dirt-road trail connecting the Twin Oaks Interim Trail to the Wauponsee Glacial Trail.

Eric Ashley

Overview

The trails at Midewin National Tallgrass Prairie are open year-round from 4:00 a.m. to 10:00 p.m.
Features: Birding — River/Creek — Views — Wildflowers — Wildlife
Dogs: Leashed

Description

The Bailey Bridge Interim Trail is a straight dirt road that travels from the southeast corner of the Twin Oaks Interim Trail to the Wauponsee Glacial Trail at the park boundary to the east. There are actually a number of bridge crossings, not just the one over Bailey Bridge.

Like most of the multi-use trails in Midewin National Tallgrass Prairie, expect to get plenty of prairie views and opportunities for birding. As it nears the end, Bailey Bridge Interim Trail passes through part of an old bunker field.

Contacts

You & this Trail


Rate Quality


   Clear Rating

Rate Difficulty

Get On-Trail Navigation

Send to Phone
Your Check-Ins

Check-Ins

none

Trail Ratings

  2.0 from 1 vote

#21402

Overall
  2.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
0%
2 Star
100%
1 Star
0%
Rankings

#191

in Illinois

#21,402

Overall
2 Views Last Month
37 Since Nov 14, 2016
Easy Easy

100%
0%
0%
0%
0%
0%

0 Comments

Trail Run Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Running