Trail Run Project Logo

Baseline Trail

 1 vote

Length

0.4 Miles 0.7 Kilometers

94%

Runnable

Doubletrack

Elevation

57' 17 m

Ascent

-46' -14 m

Descent

5%

Avg Grade (3°)

10%

Max Grade (6°)

309' 94 m

High

256' 78 m

Low

Conditions


Unknown

Getting forecast...

Trail that connects several entrances to the CMT system.

Dot Helm

Overview

Some portions could be temporarily closed by Landfill for safety if they're working in that area. Consider the usual trail etiquette/restrictions to not use trail during breakup or other times when it's soft. Your fellow trail users will appreciate it.
Dogs: Leashed

Runner Notes

Might want to be careful along the first part of trail leading from the parking lot. You can always skip that section and enter elsewhere going down the road from parking lot.

Description

This is mostly a ski trail, but there is a singletrack part leading along the ridge from the new parking lot that has been created by usage, more than actually being constructed. Look above the gate (G101) to see where to go. Once you're on top the old sled hill, it's ski trail the rest of the way.

This trail is adjacent to the active portion of the Landfill (see hybrid map), so things can change.

The entire Crevasse-Moraine system is a temporary use of MSB Landfill property. Some trails may eventually be lost, but we're hoping that's minimal with their newer plans and new technology.

Contacts

You & this Trail


Rate Quality


   Clear Rating

Rate Difficulty

Get On-Trail Navigation

Send to Phone
Your Check-Ins

Check-Ins

none

Stewarded By


Trail Ratings

  3.0 from 1 vote

#18265

Overall
  3.0 from 1 vote
5 Star
0%
4 Star
0%
3 Star
100%
2 Star
0%
1 Star
0%
Rankings

#143

in Alaska

#18,265

Overall
2 Views Last Month
11 Since Jul 27, 2016
Easy Easy

100%
0%
0%
0%
0%
0%

0 Comments

Trail Run Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Running