Bacon Ridge Phase I

 1 vote
Building Map
Loading Map Data
Map Settings
Featured Run
Trail

2.4 Miles 3.8 Kilometers

 

92% 

Runnable

Singletrack

327' 100 m

Ascent

-315' -96 m

Descent

163' 50 m

High

42' 13 m

Low

5%

Avg Grade (3°)

15%

Max Grade (9°)

Unknown

Update
This Trail content is still in development or in editorial review.

About two and a half miles of smooth and flowing singletrack in Anne Arundel County.

Tyler Broyles

Overview

Hunting is allowed the Friday after Thanksgiving for 10 days, followed by the second weekend in January ONLY. Please avoid the area on these dates if at all possible to allow the hunters to do their thing.
Features: Fall Colors — River/Creek — Wildlife

Description

Parking is available at the trailhead on Hawkins Rd. Phase II to begin pending county approval. This trail was built with support from AACo, Scenic Rivers Land Trust, MORE, MET, TrailWerks Cyclery,and Family Bike Shop. Major donors include Specialized Bicycle Company, Quality Bicycle Products, SRLT, Family Bike Shop, TrailWerks Cyclery, SC Logic, and Family Vet Clinic.

Rate Trail


   Clear

4.0 from 1 vote


Get On-Trail Navigation

Send to Phone
Your Check-Ins

Check-Ins

none

Trail Ratings

  4.0 from 1 vote

#2297

Overall
  4.0 from 1 vote
1 Star
0%
2 Star
0%
3 Star
0%
4 Star
100%
5 Star
0%
Rankings

#36

in Maryland

#2,297

Overall
22 Views Last Month
44 Since Aug 18, 2016
Easy/Intermediate Easy/Intermediate

0%
100%
0%
0%
0%
0%

Conditions



0 Comments

Trail Run Project is part of the REI Co-op family,
where a life outdoors is a life well lived.

Shop REI Running